Tuesday 20 October 2009

Turbo Honda build gets under way

The B20B block has been grout filled and the top of the block bridged to create strength. This is a cheaper option than fitting the Darton liners we normally use with these types of builds. This build will be documented in our "Current Projects" Page of our website.